MAS Dynamics · Türkiye-based EDGE Expert & Approved EDGE Auditor team WhatsApp · info@edgecertificate.com · Türkçe
EDGE certification · Turkey (Türkiye) · SHIFA

EDGE Certification in Turkey: final certification for your SHIFA project, before provisional acceptance.

In SHIFA health centres, EDGE certification is mandatory under the specification. There is no separate preliminary certification stage; the final certificate must be delivered to the contracting authority before provisional acceptance. MAS Dynamics' team in Turkey (Türkiye) delivers consulting and the GBCI-approved Approved EDGE Auditor audit under a single contract, at a fixed price.

8 + 4certified + ongoing SHIFA projects
Fixed priceaudit included · no surprises
~4 weekssite audit + GBCI review
IFC · World Bank Group

EDGE: 3 categories, 3 levels

Minimum savings thresholds against the base building:

ENERGYWATERMATERIALS 20%40% Advanced 20%20%
20%
EDGE Certified
≥ 20% in energy, water and embodied energy in materials
40%
EDGE Advanced
≥ 40% in energy (Zero Carbon Ready)
100%
EDGE Zero Carbon
Advanced + remaining energy covered by renewables/offsets
SHIFA Project and EDGE

How to obtain EDGE certification in SHIFA projects?

SHIFA (Strengthening Health Infrastructure for All) is an EU/IPA-funded health infrastructure programme run by the Ministry of Health of the Republic of Türkiye and the Council of Europe Development Bank (CEB). In the tenders, obtaining EDGE certification for the building is the contractor's responsibility.

23 provinces~60 new health centres, 23 renovations, 1 hospital
2027Programme end; construction ongoing
ASM · GSMFamily and migrant health centres
Final EDGETarget certificate in the specification; issued by GBCI
Timing: SHIFA has no separate design (preliminary) certification stage; it goes directly to the final certificate. The site audit and GBCI review take about 4 weeks. Schedule the audit at least 4 weeks before provisional acceptance.

Nothing left for you to do

We run the entire EDGE process from contract to final certificate. Consulting and audit in the same team; no second contract and no separate auditor fee.

SHIFA and the EDGE requirement →

References

Our EDGE-certified projects in Türkiye

8 healthcare buildings for the Ministry of Health under SHIFA and the World Bank (IBRD) Ankara office are Final EDGE certified; 4 more SHIFA projects are under way. Each certified project is published in the EDGE App and verifiable.

EDGE Certified

Batman Çarşı Health Centre

Health Centre · Batman · 878 m²

28% energy · 74% water · 40% materials savings

EDGE App record ↗
EDGE Certified

Adıyaman Merkez ASM-GGSM

Health Centre · Adıyaman · 1,109 m²

39% energy · 57% water · 30% materials savings

EDGE App record ↗
EDGE Advanced

Süleymaniye 4+4 GSM Building

Health Centre · Bursa (İnegöl) · 1,104 m²

57% energy · 57% water · 33% materials savings

EDGE App record ↗
EDGE Advanced

Selçuklu No. 66 Campus Family Health Centre

Health Centre · Konya · 1,189 m²

43% energy · 75% water · 32% materials savings

EDGE App record ↗
EDGE Advanced

Şanlıurfa Birecik No. 1 Family Health Centre

Health Centre · Şanlıurfa · 2,637 m²

52% energy · 66% water · 43% materials savings

EDGE App record ↗
EDGE Advanced

Şanlıurfa Karaköprü No. 1 Family Health Centre

Health Centre · Şanlıurfa · 1,081 m²

47% energy · 73% water · 36% materials savings

EDGE App record ↗
EDGE Advanced

Mersin Nusratiye Family Health Centre (İhsaniye)

Health Centre · Mersin · 1,340 m²

41% energy · 72% water · 39% materials savings

EDGE App record ↗
EDGE Advanced

Mersin Gündoğdu Family Health Centre

Health Centre · Mersin · 1,013 m²

44% energy · 51% water · 48% materials savings

EDGE App record ↗
EDGE Advanced

IBRD Ankara – YDA Center Office

Office · Ankara · 2,365 m²

67% energy · 33% water · 96% materials savings

EDGE App record ↗

Our EDGE projects abroad

EDGE Certified

Allied Bank MDC Building 3

Office · Lahore, Pakistan

8,050 m² · Final · December 2024 · 22% energy, 20% water, 21% materials

Client: Allied Bank Limited

EDGE App record ↗
EDGE Advanced

Alatbay Logistics

Cold and dry storage · Alat Free Economic Zone, Azerbaijan

5,210 m² · 41% energy, 26% water, 48% materials · 198 tCO₂ reduction per year

All references

Who it's for

Projects that require EDGE certification

SHIFA Project health centres

EDGE certification is a project requirement for family/migrant health centre and health centre construction under SHIFA (Strengthening Health Infrastructure for All), EU-funded and run by the Ministry of Health and CEB.

SHIFA Project →

Internationally financed projects

EDGE as a loan condition for residential, hotel, office and industrial projects financed by IFC, EBRD, CEB, the World Bank and green-lending banks.

Services →

Voluntary green building goal

A fast, economical and internationally recognised certificate for developers seeking marketing value, ESG reporting or lower operating costs.

What is EDGE? →
Know this before you get a quote

EDGE certification takes two parties: one who prepares and one who approves.

It's like getting a driving licence. The driving school prepares you, but the licence isn't issued by the school; it's issued by the examiner. EDGE works the same way:

  • Consultant (EDGE Expert) = driving school. Prepares the project and collects the documents.
  • Auditor (EDGE Auditor) = examiner. Checks the building and the documents and gives the certification body a "compliant" report. No certificate is issued without the auditor's signature.
  • Approved EDGE Auditor = the most experienced examiner. An auditor whose audits have been reviewed by the certification body (GBCI) and approved as "this auditor's work is reliable". This title is earned not through a course but through successfully completed audits. Not required for certification — any EDGE Auditor can audit; but a new auditor's files are reviewed longer at GBCI and may be sent back. An approved auditor's file is considered reliable; the certificate comes out faster and more smoothly. In other words, Approved is not a requirement but an extra assurance.

Why it matters: In the market, quotes often cover consulting only; the audit comes up later as a separate item. This means the price you compare at the start is not the real total cost.

The MAS Dynamics approach: The one who prepares and the one who audits are in the same team. Our price is valid until the certificate is in your hands; no separate audit fee comes up later.

If the audit is not included in the quote
1
A quote that looks reasonable is signed.
The scope is consulting only; the audit is left out.
2
As construction ends, a new need appears:
Certification requires a separate auditor and a separate fee.
3
A second contract, a second counterpart, extra time.
The auditor's experience is unknown at the start; if the file is sent back by GBCI, the schedule can slip.

Result: total cost and duration unknown at the start

MAS Dynamics quote (audit included)
✓
One quote: preparation + audit.
Consultant and auditor in the same team.
★
Extra assurance: your auditor is an Approved EDGE Auditor.
An auditor whose work GBCI has reviewed and approved is on our team. Not required for certification; but it minimises the risk of your file getting stuck at GBCI.
✓
No surprises.
No "auditor fee" comes up later.
✓
One counterpart, certificate in hand.
The audit schedule is planned from the start.

Result: cost and duration known from the start

We recommend asking two questions when you collect quotes: "Is the audit (auditor) included in this price?" and "Who is the auditor, and how many projects have they audited?" The answers let you compare quotes correctly.
Why MAS Dynamics

Türkiye-based team, international experience

Approved EDGE Auditor

Our auditor has passed GBCI's quality review and holds approved status. Preparation (EDGE Expert) and audit in the same team: your file passes the first time.

500+ projects, 4 continents

LEED, EDGE and BREEAM certification in the USA, Europe, the Middle East and Türkiye; references such as Lakhta Center and UC Merced.

Delivery compliant with the specification

A documentation package that fits the acceptance, progress payment and reporting schedule of SHIFA and similar programmes.

Fixed price, audit included

Consulting + Approved EDGE Auditor audit in a single quote. No extra fee later because "an auditor is needed".

Process

EDGE certification in 5 steps

Pre-assessment

We model the project in the EDGE App and determine the target level and required measures.

Design integration

We incorporate the measures into the project with the architectural, mechanical and electrical teams.

Preliminary certificate (design)

We prepare the documentation package, submit it for audit and obtain the preliminary certificate.

Site follow-up

We collect material approvals, photos and delivery note evidence, and arrange the site audit.

Final certificate

The post-construction audit is completed; your permanently valid EDGE certificate is delivered.

See the process in detail

The cost reality

EDGE certification is a small item in the construction budget.

< 0.1%Ratio of total EDGE cost to construction budget at health centre scale
FixedThe price does not change until the certificate is in your hands
1 contractConsulting + audit at one price; no extra auditor fee
0 surprisesThe GBCI certification fee is shown separately and clearly from the start

Choosing the wrong consultant costs more than the certificate itself: delayed acceptance, a second contract, revisions.

What matters to you

Why EDGE?

International recognition: Developed by IFC (World Bank Group), EDGE has been applied to more than 8,000 projects in over 140 countries. It is accepted as proof of green building by international financial institutions and EU-funded programmes.

Fast and economical: Instead of complex simulation, calculations based on local climate and cost data in the free EDGE App. Certification in much less time and at lower cost than LEED/BREEAM.

Measurable benefit: The certificate documents energy, water and materials savings as percentages; it lowers operating costs and provides direct input to ESG reporting.

Differences between EDGE, LEED and BREEAM →

140+countries
8,000+certified projects
2014launched by IFC

Which building types can get EDGE?

  • Healthcare: family/migrant health centres, clinics, diagnostic centres, hospitals
  • Residential: detached, apartment, mass housing
  • Office, retail, malls, supermarkets
  • Hotels, resorts, serviced apartments
  • Industrial: light industry, warehouses, factories
  • Education: schools, universities, dormitories
  • Existing buildings and renovation projects
Our team

MAS Dynamics Türkiye EDGE team

Approved EDGE AuditorEDGE ExpertLEED APLEED FacultyBREEAMASHRAE BCxPWELL PTA

MAS Dynamics is a green building consulting and engineering firm; it has completed more than 500 projects in Türkiye and abroad in LEED, EDGE, BREEAM and WELL certification, energy modelling and commissioning. EDGE projects in Türkiye are run by an İstanbul-based, Turkish-speaking engineering team that comes to site; prices are fixed from the start.

Our team's audit credentials: Auditors who pass the EDGE Auditor training and exam sign a contract with GBCI and start auditing; every project they submit is reviewed by GBCI for quality. An auditor who meets GBCI's quality expectations is granted "Approved" EDGE Auditor status. In other words, this title is earned not through training but through completed audits verified by GBCI; few auditors in Türkiye hold this status.

The engineer leading the team has been a green building consultant since 2011, with more than 250 certification, energy modelling and building physics projects in the USA, Türkiye, Russia, Ireland, Poland, Kuwait and Jordan. References include Lakhta Center, Europe's tallest building, and UC Merced, the first net-zero university campus in the USA.

About MAS Dynamics

Frequently asked

Short answers

How long does EDGE certification take?

3–6 months from design stage to final certificate, depending on project scale and document readiness. A preliminary (design) certificate can be obtained in about 4 weeks.

How much does EDGE certification cost?

There are three items: the certification body (GBCI/SGS) fee, the EDGE Auditor audit fee and consulting. For a small health centre, the total cost is far below LEED. The cost is clarified in a one-to-one discussion based on your project details.

Construction has started — can we still get it?

Yes. If material and equipment choices have not yet been finalised, certification can start even at the shell construction stage. The earlier, the fewer the revisions.

All questions →

Talk to us about your project

Every project is assessed individually. Write to us on WhatsApp or by email; let's review your project together.

  info@edgecertificate.com